2026 Ram® 1500 RHO
Miles: 18 • VIN: 1C6SRFUP1TN186557 • Stock #: RA6078
Vehicle Specification
Features
Hours
Address and contact information
161 West Garfield Road, Aurora, Ohio 44202
(330) 562-2600
Dealer Price
$6,757 off MSRP! 12-Way/1-Way Trailer Connector, 14.4" Touchscreen Display, 240 Amp Alternator, 3.92 Rear Axle Ratio, 4G LTE Wi-Fi Hot Spot, Bed Utility Group, Connected Travel and Traffic Services, Connectivity - US/Canada, Disassociated Touchscreen Display, Dome Dual LED Reading Lamp, Driver Power Seat Back Massage, Driver Seat Memory, Driver/Passenger Wrapped Assist Handles, Drowsy Driver Detection, Dual Wireless Charging Pad, Dual-Pane Panoramic Sunroof, Evasive Steer Assist, Exterior 115V AC Outlet, Exterior Mirrors with Memory, Front Passenger Interactive Display, Front Passenger Power Seat Back Massage, Full Length Premium Upgraded Floor Console, GPS Navigation, Hands-Free Active Driving Assist System, Harman/Kardon 19 Speaker Premium Sound, HD Radio, Heads-Up Display, Heated Second Row Seats, Integrated Center Stack Radio, Integrated Voice Command with Bluetooth, Intersection Collision Assist System, Leather/Carbon Flat-Bottom Steering Wheel, LED CHMSL Lamp, Luxury Front Door Trim Panel, MOPAR 4 Adjustable Cargo Tie-Down Hooks, MOPAR Deployable Bed Step, Power Adjustable Pedals with Memory, Power Tailgate, Premium Wrapped Instrument Panel Bezel, Quick Order Package 22Y RHO, Radio: Uconnect 5 Nav with 14.4" Display, Radio/Driver Seat/Mirrors/Pedals Memory, Rain Sensitive Windshield Wipers, Real Carbon Fiber Interior Accents, Rear 60/40 Folding Split Recline Seat, RHO Level 1 Equipment Group, SiriusXM Radio Service, Smartphone as a Key Capable, Surround View Camera System, Traffic Sign Recognition, USB Host Flip, Ventilated Front Seats, Ventilated Rear Seats, Wheels: 18" x 9" Bead-Lock Aluminum. 2026 Ram 1500 RHO 4D Crew Cab Diamond Black Crystal Pearlcoat 4WD 8-Speed Automatic 3.0L I6
RHO
Ken Ganley Chrysler Dodge Jeep Ram of Aurora has partnered with Capital One. Unlock real monthly payments and APRs based on your unique information with no impact to your credit score.
Sunday
Closed
Monday
9:00am - 8:00pm
Tuesday
9:00am - 6:00pm
Wednesday
9:00am - 6:00pm
Thursday
9:00am - 8:00pm
Friday
9:00am - 6:00pm
Saturday
9:00am - 5:00pm
RHO